Case Study: Overcoming Outdated & Inaccurate Drawings of Existing Infrastructure to Enable Precise Retrofit Design

10:30 am - Thursday 3rd December 2026

  • Exploring how Prometheus developed protocols for documenting existing site conditions to create a more reliable foundation for retrofit design and planning
  • Assessing how Prometheus improved project predictability and reducing redesigns, schedule delays and operational risk through validated as-built documentation and early identification of hidden infrastructure conflicts
  • Identifying how Prometheus leveraged field verification tools such as laser scanning to strengthen design precision and avoid harming the live environment

Speakers:

Head of Construction
Prometheus Group