Panel: Evaluating Existing Space Constraints to Ensure New Equipment Integrates with Legacy Infrastructure Layouts

3:40 pm - Wednesday 2nd December 2026

  • Creating retrofit layouts that maximize available space while accommodating new equipment, cooling systems and routing requirements within existing facility constraints
  • Coordinating equipment sizing, access pathways and installation sequencing early to reduce fitment issues and prevent deployment delays
  • Assessing how legacy building layouts, freight access limitations and confined space impact equipment selection, installation flexibility and long-term maintainability

Speakers:

Senior Manager of Mission Critical
Ramboll
Data Center Strategy
Ramboll
Director of Engineering
Jones Lang LaSalle